); new long-term investment strategy prioritizing low- or zero-net carbon forms of
mobility
2040 Modal shift in logistics chains, especially within heavy industry.
3.3 Backcasting scenario narrative
Low-Impact Mobility Project Evaluation (LIMPE)
Climate change is occurring. Is it natural or anthropogenic? It doesn’t matter. Even
though the future is inherently uncertain, one certainty
/media/loftslag/Group4.pdf
°. Subsequently, the domain was cropped so that only grid-points
between latitudes 62.5 and 66.5°N and 13 and 25°W were kept. In the end, data from 65 grid-
points were used, instead of 130 before cropping the domain.
Projections are given for two periods: 2040 – 2060 and 2080 – 2100, and for an ensemble of
33 climate models. For each one of them, two types of data are available: monthly
precipitation
/media/vedurstofan-utgafa-2022/VI_2022_006_extreme.pdf
November, December, January, February, March-April-May and the overview article (list of links).
Calendar
Below is a calendar with a short-cut to each day of this month's events:
August: 16-17-18-19-20-21-22-23-24-25-26-27-28-29-30-31 - on the Bárðarbunga central volcano
Panoramic view towards the eruptive site in Holuhraun 3rd September 2014. Photo: Richard Yeo.
Updated information
31
/earthquakes-and-volcanism/articles/nr/3000
in reversed order. In combination, the monthly articles give an overview of events: August,
September, October, November, December, January, February and the current update.
Calendar
Below is a calendar with a short-cut to each day of this month's events:
August: 16-17-18-19-20-21-22-23-24-25-26-27-28-29-30-31 - on the Bárðarbunga central
volcano
Panoramic view towards the eruptive site
/media/jar/Bardarbunga-2014_August-events.pdf
November, December, January, February, March-April-May and the overview article (list of links).
Calendar
Below is a calendar with a short-cut to each day of this month's events:
August: 16-17-18-19-20-21-22-23-24-25-26-27-28-29-30-31 - on the Bárðarbunga central volcano
Panoramic view towards the eruptive site in Holuhraun 3rd September 2014. Photo: Richard Yeo.
Updated information
31
/earthquakes-and-volcanism/articles/nr/3000/
.......................................................... 16
Concluding remarks from the break out sessions – comparing the water sector and road
infrastructure........................................................................................................................ 24
Annex 1. Task of break out groups ..................................................................................... 25
Annex 2
/media/vedurstofan/NONAM_1st_workshop_summary_v3.pdf
in the data used in making the
decision and the factors are interlinked, all of which makes
the problem highly complex. The part of the net defined by
variables and links is relatively easily communicated to
stakeholders (Henriksen et al., 2007b). However the
tal Management 88 (2008) 1025–1036
quantitative part, with the conditional probability tables
(CPTs), the numbers, is the step where
/media/loftslag/Henriksen_Barlebo-2008-AWM_BBN-Journ_Env_Management.pdf
increased net precipitation and increased rainfall intensity put pressure on the sewage
system and the lake dam. Flooding of the town is expected to occur more frequently. Future flooding
storms could be as high as 2,5 meters.
The challenges have been divided into two main themes: sea level change and rainfall.
NONAM Risk Assessment and Stakeholder Investment. Multidisciplinary Workshop
/media/loftslag/CASE_A___Jes_Pedersen_(Region_Midt,_Dk)_Introduction.pdf
increased net precipitation and increased rainfall intensity put pressure on the sewage
system and the lake dam. Flooding of the town is expected to occur more frequently. Future flooding
storms could be as high as 2,5 meters.
The challenges have been divided into two main themes: sea level change and rainfall.
NONAM Risk Assessment and Stakeholder Investment. Multidisciplinary Workshop
/media/loftslag/Case_A___Horsens_Fjord.pdf