Search

54 results were found for 新太阳城官网网页-新太阳城官网网页-【✔️网址㊙️sogou7.com✔️-新太阳城官网网页-新太阳城官网网页-(✔️访问sogou7.com✔️)-新太阳城官网网页-新太阳城官网网页-新太阳城官网网页-(✔️输入bet25.net✔️).


Results:

  • 21. VED_AnnualReport-2013_screen

    and our intention is to run these models dur- ing times of hazardous events and even on a daily basis to further improve monitoring. Avalanche monitoring has progressed. The em- phasis is now on improving our services, especially to the Icelandic Road and Coastal Administration with regard to transport. The reason is that com- munity structure has changed considerably in recent years and the need /media/vedurstofan/utgafa/arsskyrslur/VED_AnnualReport-2013_screen.pdf
  • 22. 2005EO260001

    level in Skeidará waned. The last sign of a crater explosion was seen at GRF early on 6 November, leaving only a weak tremor signal from the remnants of the jökulhlaup. The jökulhlaup fi nally ended in early December, after ~0.8 km3 of water had drained from the Grímsvötn lake (J. Hardardóttir, personal com- munication, 2005). Location and Volume Constraints Earthquake locations at Grímsvötn /media/jar/myndsafn/2005EO260001.pdf
  • 23. Paper-Olafur-Rognvaldsson_92

    a systematic com- parison of results to observed precipitation has been carried out. Un- dercatchment of solid precipitation is dealt with by looking only at days when precipitation is presumably liquid or by considering the occurrence and non-occurrence of precipitation. Away from non- resolved orography, the long term means (months, years) of observed and simulated precipitation are often /media/ces/Paper-Olafur-Rognvaldsson_92.pdf
  • 24. Refsgaard_etal-2007-Uncertainty-EMS

    and possibly the stake- holders at different phases of the modelling project. Many QA guidelines exist such as Middlemis (2000) and Van Waveren et al. (1999). The HarmoniQuA project (Schol- ten et al., 2007; Refsgaard et al., 2005a) has developed a com- prehensive set of QA guidelines for multiple modelling domains combined with a supporting software tool, MoST (downloadable via http /media/loftslag/Refsgaard_etal-2007-Uncertainty-EMS.pdf
  • 25. Perrels-CBA

    operational cost, etc.) and the annual revenues • consider an appropriate discount rate and assess NPV (net present value), IRR (internal rate of return), and net cash flows • rank alternatives by score level • SCBA: social CBA – total benefits -/- total costs for society, in this case benefits and costs often don’t accrue (entirely) to the same organisation due to the public nature of a project /media/loftslag/Perrels-CBA.pdf
  • 26. VI_2009_006_tt

    to theoretical framework. I do also want to thank him for an enjoyable time during this work, both in the office and in the field. This work was carried out as a part of the Skaftá cauldrons research project which was funded and supported by the Icelandic Centre For Research (RANNÍS), Kvískerja- sjóður, the NASA Astrobiology Institute, Landsvirkjun (the National Power Com- pany), the National Energy /media/vedurstofan/utgafa/skyrslur/2009/VI_2009_006_tt.pdf
  • 27. Huntjens_etal-2010-Climate-change-adaptation-Reg_Env_Change

    at the operational/local level. A calibrated approach (standardized questionnaires and interviews, expert judgment, and reinterpretation of out- comes by means of relevant literature) was used to com- pare the state of affairs in water management in the selected case-studies. Adaptive and integrated water management Given the expected increase of climate-related extreme events, water governance capabilities /media/loftslag/Huntjens_etal-2010-Climate-change-adaptation-Reg_Env_Change.pdf
  • 28. Gudmundsson-etal-2011-PR-7282-26519-1-PB

    -corrected SPOT 5 high-resolution geometric (HRG) images with 2.5 m 2.5 m spatial resolution, acquired in the autumn 2003 and (4) airborne polarimetric synthetic aperture radar images observed simultaneously to the 1998 EMISAR images and the EMISAR DEM viewed as a shaded relief image (Magnu´sson et al. 2005b). We estimate the average specific net mass balance (in m yr1 w. eq.) as bn r DV A1  N /media/ces/Gudmundsson-etal-2011-PR-7282-26519-1-PB.pdf
  • 29. Group4

    ); new long-term investment strategy prioritizing low- or zero-net carbon forms of mobility 2040 Modal shift in logistics chains, especially within heavy industry. 3.3 Backcasting scenario narrative Low-Impact Mobility Project Evaluation (LIMPE) Climate change is occurring. Is it natural or anthropogenic? It doesn’t matter. Even though the future is inherently uncertain, one certainty /media/loftslag/Group4.pdf
  • 30. 2010_005_

    which are significantly lower com- pared with similar beginning and end years. Consequently, for the 2004–50 period, the average RCM warming rates of 0.29 K per decade over the ocean, and 0.35 K per decade over the land are somewhat larger than for the reduced IPCC ensemble mean. Additionally, the tabulated values of SAT differences between the 1961–90 control period and either the 2021–50 /media/ces/2010_005_.pdf

Page 3 of 6






Other related web sites


This website is built with Eplica CMS