39 results were found for 澳门皇冠赌城手机版-新万博客户端2.0下载-(✔️网址sogou7.com✔️)-澳门皇冠赌城手机版-博彩公司-【✔️访问㊙️52bet.net✔️】-澳门皇冠赌城手机版-澳门皇冠赌城手机版-澳门皇冠赌城手机版-【✔️网址㊙️315bet.net✔️】.
Century control runs, as well as 21st Century forecast runs, submitted
by various institutions to the Intergovernmental Panel on Climate Change (IPCC) for their Forth
11
Table 1. General circulation and regional climate models that were considered in this study.
Model Version Model Name, Institute
BCCR BCM 2.0 Bergen Climate Model, Bjerknes Centre for Climate Research, Bergen, Norway
CCCMA CGCM 3.1
/media/ces/2010_005_.pdf
at the operational/local level.
A calibrated approach (standardized questionnaires and
interviews, expert judgment, and reinterpretation of out-
comes by means of relevant literature) was used to com-
pare the state of affairs in water management in the
selected case-studies.
Adaptive and integrated water management
Given the expected increase of climate-related extreme
events, water governance capabilities
/media/loftslag/Huntjens_etal-2010-Climate-change-adaptation-Reg_Env_Change.pdf
averages, minimum values for half-width depressions are 6.53 hPa in winter, and
4.25 hPa in summer. Across the study domain, this results in an average of 1.7 cyclones identi-
fied per day in winter, and 2.0 cyclones per day in summer.
5 Spatial distribution of cyclone centres
When determining the areal density of the long-term spatial distribution of cyclone centres, the
area represented by each
/media/vedurstofan/utgafa/skyrslur/2015/VI_2015_005.pdf
of events closely.
Photo: Sigurlaug Gunnlaugsdóttir.
Bárðarbunga
Pálmi Erlendsson, Bergur H. Bergsson and others installing GPS and com-
munication equipment. Photos: Þorgils Ingvarsson and Benedikt G. Ófeigsson.
I C E L A N D I C M E T O F F I C E / A N N U A L R E P O R T 2 0 1 4
5
The magma intrusion from Bárðarbunga
to the eruption site at Holuhraun and
related tremor pulses
/media/vedurstofan/utgafa/skyrslur/2015/IMO_AnnualReport2014.pdf
and our intention is to run these models dur-
ing times of hazardous events and even on a daily
basis to further improve monitoring.
Avalanche monitoring has progressed. The em-
phasis is now on improving our services, especially
to the Icelandic Road and Coastal Administration
with regard to transport. The reason is that com-
munity structure has changed considerably in recent
years and the need
/media/vedurstofan/utgafa/arsskyrslur/VED_AnnualReport-2013_screen.pdf
level in Skeidará waned. The last sign of a
crater explosion was seen at GRF early on 6
November, leaving only a weak tremor signal
from the remnants of the jökulhlaup. The
jökulhlaup fi nally ended in early December,
after ~0.8 km3 of water had drained from the
Grímsvötn lake (J. Hardardóttir, personal com-
munication, 2005).
Location and Volume Constraints
Earthquake locations at Grímsvötn
/media/jar/myndsafn/2005EO260001.pdf
and possibly the stake-
holders at different phases of the modelling project.
Many QA guidelines exist such as Middlemis (2000) and
Van Waveren et al. (1999). The HarmoniQuA project (Schol-
ten et al., 2007; Refsgaard et al., 2005a) has developed a com-
prehensive set of QA guidelines for multiple modelling
domains combined with a supporting software tool, MoST
(downloadable via http
/media/loftslag/Refsgaard_etal-2007-Uncertainty-EMS.pdf
2. Thickness of the landslide debris (m) in exploratory pits (Árni Hjartarson, 2015).
Pit name Landslide A Landslide B Landslide C
SG-21 0 0 >2.0
SG-22 0.9 1.5 –
SG-23 0.5 1.0 –
SG-24 0.6 0.8 >0.5
SG-25 – – –
SG-29 0.52 0 >1.6
Average 0.65 1.1 >1.4
19
Árni Hjartarson (2015) from ÍSOR investigated possible source areas for these large prehistoric
landslides in the fall of 2015. He concluded
/media/vedurstofan-utgafa-2016/VI_2016_006_rs.pdf
improving
management policies and practices by learning from the
outcomes of implemented management strategies. Partici-
patory integrated assessment is here a form of problem
structuring for identification of gaps, ambiguity and
multiple frames, confrontation, and integration of the
most divergent views with respect to a given problem
situation.
Additional methods and tools that AM require com/media/loftslag/Henriksen_Barlebo-2008-AWM_BBN-Journ_Env_Management.pdf