52 results were found for 澳门门户网网址最新-im体育官网app下载网址入口-【✔️推荐㊙️700bet.net✔️】-澳门门户网网址最新-隆彩时时彩-【✔️输入㊙️sogou7.com✔️】-澳门门户网网址最新-澳门门户网网址最新-澳门门户网网址最新-(✔️输入360bet.net✔️).
and our intention is to run these models dur-
ing times of hazardous events and even on a daily
basis to further improve monitoring.
Avalanche monitoring has progressed. The em-
phasis is now on improving our services, especially
to the Icelandic Road and Coastal Administration
with regard to transport. The reason is that com-
munity structure has changed considerably in recent
years and the need
/media/vedurstofan/utgafa/arsskyrslur/VED_AnnualReport-2013_screen.pdf
level in Skeidará waned. The last sign of a
crater explosion was seen at GRF early on 6
November, leaving only a weak tremor signal
from the remnants of the jökulhlaup. The
jökulhlaup fi nally ended in early December,
after ~0.8 km3 of water had drained from the
Grímsvötn lake (J. Hardardóttir, personal com-
munication, 2005).
Location and Volume Constraints
Earthquake locations at Grímsvötn
/media/jar/myndsafn/2005EO260001.pdf
images (Fig. 7 and Table 2);
with an accuracy of about half the pixel size (Berthier et al.,
2005). The magnitude of the SPOT5 velocity in profile DD’
is similar to the observations made in the 1930s (Fig. 6a). A
good spatial coverage was obtained by using two SPOT im-
ages from late summer 2002, but reliable signals were only
obtained for limited areas when an attempt was made to de-
termine
/media/ces/Adalgeirsdottir-etal-tc-5-961-2011.pdf
of events closely.
Photo: Sigurlaug Gunnlaugsdóttir.
Bárðarbunga
Pálmi Erlendsson, Bergur H. Bergsson and others installing GPS and com-
munication equipment. Photos: Þorgils Ingvarsson and Benedikt G. Ófeigsson.
I C E L A N D I C M E T O F F I C E / A N N U A L R E P O R T 2 0 1 4
5
The magma intrusion from Bárðarbunga
to the eruption site at Holuhraun and
related tremor pulses
/media/vedurstofan/utgafa/skyrslur/2015/IMO_AnnualReport2014.pdf
Simulatio
n
mode
l
(scientific
)
Im
pr
o
ve
m
o
de
l
(quality
)
Fa
rm
er
s,
Fa
rm
busines
s
advisor
sNO
P
IN
D
Interview
s
NO
P
IN
D Qu
es
tio
n
n
ai
re
–
verificatio
n
NO
P
OT
:Researcher
s
M
KA/
M
M
(re
nements
)
KA
M
Has
e
I
Simulatio
n
mode
l
(scientific
;
discussio
n
su
pp
o
rt
)
Im
pr
o
ve
m
o
de
l
(quality
,
acceptance
)
Farmers
,loca
l
authorities
,
association
s
IN
D Reques
t
fo
rdat
a
N
/media/loftslag/Hare-2011-ParticipatoryModelling.pdf
/$ - see front matter 2007 Elsevier Ltd. All rights reserved.
doi:10.1016/j.envsoft.2007.02.004
odelling process e A framework
e
an der Sluijs b, Anker Lajer Højberg a,
eghem c,d
d (GEUS), Copenhagen, Denmark
, Department of Science Technology and Society,
, The Netherlands
e 22 (2007) 1543e1556
www.elsevier.com/locate/envsoft
the pursuit of the objectives of preserving, protecting and im-
proving
/media/loftslag/Refsgaard_etal-2007-Uncertainty-EMS.pdf
Manage- Basic Purchase Road Road net- Const- Acquisi- Govern- Com- Participati- Value Miscel- Total 2009
ment and road of equip- system work post- ruction tion of ment missi- on of the added laneous cost
operating manage- ment develop- poned-, of land grants ons European tax over- level
costs ment ment comprehen- build- and com- Regional De- heads
1991- 1991- sive- and ings pensation
/media/loftslag/Traffc-maintenance_expenditures.pdf
riskianalyysit - ilmaston muutoksen synnyttämät riskit ja mahdollisuudet. 12.03.2009, Research Report VTT-R-01942-09, Tampere. 13 p. + app. 24 p.
Linnerud, Kristin (2009) Test and evaluation of a climate risk assessment procedure. Case study: The Norwegian hydro power company SFE. CICERO, University of Oslo. Report 2009:3. Feb.2009. 44 p. ISSN:0804-4562.
Linnerud, Kristin (2009) Climate change
/ces/publications/nr/1941
of climate change on the routine and periodic maintenance of roads. Helsinki
2009. Finnish Road Administration, Central Administration. Finnra reports 8/2009, 66 p. +
app. 8 p. ISSN 1459-1553, ISBN 978-952-221-172-9, TIEH 3201122-v. (in Finnish, abstract in English)
[5] Salanne, i., Byring, B., Valli, R., Tikkanen, R., Peltonen, P., Haapala, J., Jylhä, K., Tolonen-Kivimäki, O.,
and Tuomenvirta, H
/media/loftslag/CASE_B__Heikki_Tuomenvirta_(FMI)_Introduction.pdf