59 results were found for mg娱乐平台进入-ag亚游集团App下载官网网站-【✔️输入㊙️700bet.net✔️】-mg娱乐平台进入-jdb电子夺宝首页平台-【✔️输入㊙️bet25.net✔️】-mg娱乐平台进入-mg娱乐平台进入-沙巴足球买球软件平台平台-(✔️网址315bet.net✔️).
riskianalyysit - ilmaston muutoksen synnyttämät riskit ja mahdollisuudet. 12.03.2009, Research Report VTT-R-01942-09, Tampere. 13 p. + app. 24 p.
Linnerud, Kristin (2009) Test and evaluation of a climate risk assessment procedure. Case study: The Norwegian hydro power company SFE. CICERO, University of Oslo. Report 2009:3. Feb.2009. 44 p. ISSN:0804-4562.
Linnerud, Kristin (2009) Climate change
/ces/publications/nr/1941
of climate change on the routine and periodic maintenance of roads. Helsinki
2009. Finnish Road Administration, Central Administration. Finnra reports 8/2009, 66 p. +
app. 8 p. ISSN 1459-1553, ISBN 978-952-221-172-9, TIEH 3201122-v. (in Finnish, abstract in English)
[5] Salanne, i., Byring, B., Valli, R., Tikkanen, R., Peltonen, P., Haapala, J., Jylhä, K., Tolonen-Kivimäki, O.,
and Tuomenvirta, H
/media/loftslag/CASE_B__Heikki_Tuomenvirta_(FMI)_Introduction.pdf
recorded at 5-13 km depth, but fewer than
yesterday.
GPS deformation: Measurements from around Eyjafjallajökull indicate no major net
discplaceaments, suggesting a stabilization of the surface deformation
since yesterday.
Other remarks: Grainsize analysis of samples taken of ash that fell on May 3rd at 64
km distance from the eruption site shows that about 5 % of the ash is
smaller
/media/jar/Eyjafjallajokull_status_2010-05-07_IES_IMO.pdf
opportunity evaluation
Case studies
NOE Net
SEAS-NVE
Findings of case studies
• Distribution companies generally well
equipped for climate change
– Cabling of all overhead lines well under way
– Distribution boxes in areas with increased risk of
flooding are elevated already
– Salt spray further inland is becoming an increasing
problem for substations and transformers
Cabling in Denmark
/media/ces/James-Smith_Edward_CES_2010.pdf
)
is shown. At the margin the grid boxes of the RCAO RCM are
visible. The area between Illulisat and Swiss camp is commonly
called Paakitsôq.
respectively. The Automatic Weather Stations (AWS) Swiss Camp and Crawford are located
on the ice sheet and are operated by the Greenland Climate Network (GC-net) (Steffen and
Box, 2001). The locations of the stations are indicated in Fig. 1, further details
/media/ces/ces_geus_paakitsoq_full_report.pdf
operational cost, etc.) and the annual
revenues
• consider an appropriate discount rate and assess NPV (net present
value), IRR (internal rate of return), and net cash flows
• rank alternatives by score level
• SCBA: social CBA – total benefits -/- total costs for society, in this
case benefits and costs often don’t accrue (entirely) to the same
organisation due to the public nature of a project
/media/loftslag/Perrels-CBA.pdf
Manage- Basic Purchase Road Road net- Const- Acquisi- Govern- Com- Participati- Value Miscel- Total 2009
ment and road of equip- system work post- ruction tion of ment missi- on of the added laneous cost
operating manage- ment develop- poned-, of land grants ons European tax over- level
costs ment ment comprehen- build- and com- Regional De- heads
1991- 1991- sive- and ings pensation
/media/loftslag/Traffc-maintenance_expenditures.pdf
tg
ui
da
n
ce
fo
rt
ra
ns
bo
un
da
ry
w
at
er
s,
pr
ep
ar
ed
an
d
P. van der Keur et al.
(floo
dmanag
ement
)an
d
wat
er
qualit
y
ag
re
ed
u
po
n
in
co
m
m
o
n
u
n
de
rs
ta
nd
in
g,
creat
ed
th
e
bas
is
fo
rth
e
formul
atio
n
o
f
joi
nt
m
ea
su
re
s
(Fr
ijte
rs
an
d
Le
en
tv
aa
r
200
3)
Mo
del
s
(na
tural
,te
chnica
l
an
d
so
ci
al
sy
ste
m
s):
Uncert
aint
y
ha
s
to
be
incorp
orated
:
1:
Ep
ist
/media/loftslag/VanderKeur_etal-2008-Uncertainty_IWRM-WARM.pdf
). Meteorological observations carried
out on Storbreen in the summer of 1955 (Liestøl1967) revealed that net radiation is the most impor-tant contributor to the ablation at Storbreen. An au-tomatic weather station (AWS) has bee operatedin the ablation zone of Storbreen since September2001 providing a near-continuous series of meteor-
ology and surface energy balance data. Analysis ofthe first five years
/media/ces/GA_2009_91A_4_Andreassen.pdf
stage
)Suppor
t
an
d
ski
lls
n
ee
de
d
Har
e
et
a
l.
(2003
)
X
X
An
aly
se
lin
ks
be
tw
ee
n
participator
y
structur
e
an
d
proces
s
implementatio
n
Ba
rr
et
ea
u
et
a
l.
(2010
)
X
X
X
Pr
o
vid
e
cle
ar
de
sc
rip
tio
n
o
fproces
s
(m
an
ag
e
ex
pe
ct
at
io
n
s);
monitorin
g
an
d
evaluatio
n
Bot
s
an
d
va
n
Daale
n
(2008
)
X
X
X
X
X
Su
pp
o
rt
pr
o
ce
ss
de
sig
n
Ad
ap
te
d
fra
m
ew
o
rk
u
se
d
in
th
/media/loftslag/Hare-2011-ParticipatoryModelling.pdf