Search

54 results were found for pk10幸运飞艇开奖记录-pk10幸运飞艇开奖记录-【✔️输入㊙️sogou7.com✔️】-pk10幸运飞艇开奖记录-pk10幸运飞艇开奖记录-(✔️访问sogou7.com✔️)-pk10幸运飞艇开奖记录-pk10幸运飞艇开奖记录-pk10幸运飞艇开奖记录-(✔️输入bet91.net✔️).


Results:

  • 21. VED_AnnualReport-2013_screen

    and our intention is to run these models dur- ing times of hazardous events and even on a daily basis to further improve monitoring. Avalanche monitoring has progressed. The em- phasis is now on improving our services, especially to the Icelandic Road and Coastal Administration with regard to transport. The reason is that com- munity structure has changed considerably in recent years and the need /media/vedurstofan/utgafa/arsskyrslur/VED_AnnualReport-2013_screen.pdf
  • 22. 2005EO260001

    level in Skeidará waned. The last sign of a crater explosion was seen at GRF early on 6 November, leaving only a weak tremor signal from the remnants of the jökulhlaup. The jökulhlaup fi nally ended in early December, after ~0.8 km3 of water had drained from the Grímsvötn lake (J. Hardardóttir, personal com- munication, 2005). Location and Volume Constraints Earthquake locations at Grímsvötn /media/jar/myndsafn/2005EO260001.pdf
  • 23. Paper-Olafur-Rognvaldsson_92

    a systematic com- parison of results to observed precipitation has been carried out. Un- dercatchment of solid precipitation is dealt with by looking only at days when precipitation is presumably liquid or by considering the occurrence and non-occurrence of precipitation. Away from non- resolved orography, the long term means (months, years) of observed and simulated precipitation are often /media/ces/Paper-Olafur-Rognvaldsson_92.pdf
  • 24. Refsgaard_etal-2007-Uncertainty-EMS

    and possibly the stake- holders at different phases of the modelling project. Many QA guidelines exist such as Middlemis (2000) and Van Waveren et al. (1999). The HarmoniQuA project (Schol- ten et al., 2007; Refsgaard et al., 2005a) has developed a com- prehensive set of QA guidelines for multiple modelling domains combined with a supporting software tool, MoST (downloadable via http /media/loftslag/Refsgaard_etal-2007-Uncertainty-EMS.pdf
  • 25. Perrels-CBA

    operational cost, etc.) and the annual revenues • consider an appropriate discount rate and assess NPV (net present value), IRR (internal rate of return), and net cash flows • rank alternatives by score level • SCBA: social CBA – total benefits -/- total costs for society, in this case benefits and costs often don’t accrue (entirely) to the same organisation due to the public nature of a project /media/loftslag/Perrels-CBA.pdf
  • 26. VI_2009_006_tt

    to theoretical framework. I do also want to thank him for an enjoyable time during this work, both in the office and in the field. This work was carried out as a part of the Skaftá cauldrons research project which was funded and supported by the Icelandic Centre For Research (RANNÍS), Kvískerja- sjóður, the NASA Astrobiology Institute, Landsvirkjun (the National Power Com- pany), the National Energy /media/vedurstofan/utgafa/skyrslur/2009/VI_2009_006_tt.pdf
  • 27. Huntjens_etal-2010-Climate-change-adaptation-Reg_Env_Change

    at the operational/local level. A calibrated approach (standardized questionnaires and interviews, expert judgment, and reinterpretation of out- comes by means of relevant literature) was used to com- pare the state of affairs in water management in the selected case-studies. Adaptive and integrated water management Given the expected increase of climate-related extreme events, water governance capabilities /media/loftslag/Huntjens_etal-2010-Climate-change-adaptation-Reg_Env_Change.pdf
  • 28. Gudmundsson-etal-2011-PR-7282-26519-1-PB

    -corrected SPOT 5 high-resolution geometric (HRG) images with 2.5 m 2.5 m spatial resolution, acquired in the autumn 2003 and (4) airborne polarimetric synthetic aperture radar images observed simultaneously to the 1998 EMISAR images and the EMISAR DEM viewed as a shaded relief image (Magnu´sson et al. 2005b). We estimate the average specific net mass balance (in m yr1 w. eq.) as bn r DV A1  N /media/ces/Gudmundsson-etal-2011-PR-7282-26519-1-PB.pdf
  • 29. Group4

    ); new long-term investment strategy prioritizing low- or zero-net carbon forms of mobility 2040 Modal shift in logistics chains, especially within heavy industry. 3.3 Backcasting scenario narrative Low-Impact Mobility Project Evaluation (LIMPE) Climate change is occurring. Is it natural or anthropogenic? It doesn’t matter. Even though the future is inherently uncertain, one certainty /media/loftslag/Group4.pdf
  • 30. ces-oslo2010_proceedings

    anomalies of the WTs during the periods leading up to the five most severe droughts as compared to the average frequency of a given WT for the same period of the year over the entire data record. A period equal to dreg preceding the drought plus the 20 first days of the drought was used. All WTs with a net positive frequency anomaly over the five events were considered to be associated /media/ces/ces-oslo2010_proceedings.pdf

Page 3 of 6






Other related web sites


This website is built with Eplica CMS