Search

67 results were found for WA 0821 1305 0400 Jasa Perancangan Rumah 30 Juta Berpengalaman Kebon Jeruk Jakarta Barat.


Results:

  • 41. Grimsvotn_status_2010-11-03_IES_IMO

    Coastguard (TF-SIF). Meltwater: Water continues to drain from Grímsvötn. At 09:30 GMT today, discharge was gauged at 2,600 m3/s on the Gígja river. Electrical conductivity has increased to 560 µS/cm. Conductively levels in the Súla river are similar, indicating that a small volume of geothermal water is draining from the western side of the Skeiðarárjökull glacier /media/vatnafar/flod/Grimsvotn_status_2010-11-03_IES_IMO.pdf
  • 42. BIGR_windrose_2005-2014

    Wind rose BIGR 2005 − 2014 90 80 70 60 50 40 30 2010360350340 330 320 310 300 290 280 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 120 110 100 1 2 3 4 5 6 Frequency of wind direction (%) Aerodrome Total observations: 10329 Calm: 1.7% Variable winds: 0.34% Average wind speed for wind direction Wind direction (°) Wind speed (knots ) 0 5 10 15 0 45 90 135 180 225 270 315 360 N E S W /media/vedur/BIGR_windrose_2005-2014.pdf
  • 43. BITN_windrose_2005-2014

    Wind rose BITN 2005 − 2014 90 80 70 60 50 40 30 2010360350340 330 320 310 300 290 280 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 120 110 100 1 2 3 4 Frequency of wind direction (%) Aerodrome Total observations: 9711 Calm: 5.2% Variable winds: 5.7% Average wind speed for wind direction Wind direction (°) Wind speed (knots ) 0 5 10 15 0 45 90 135 180 225 270 315 360 N E S W N /media/vedur/BITN_windrose_2005-2014.pdf
  • 44. Eyjafjallajokull_status_2010-05-01_IES_IMO

    scientists at Gígjökull; aerial observations from two scientific overflights: TF-SIF (10:30–11:00 GMT) and Eagle Air (16:40–17:15 GMT). Eruption plume: Height (a.s.l.): TF-SIF observations at 10:30 GMT confirmed an ash plume rising to 4– 5.4 km (13–18,000 ft) near to Eyjafjallajökull. Clouds of ash at lower elevations observed drifting south-east of the eruption site. No verifiable /media/jar/Eyjafjallajokull_status_2010-05-01_IES_IMO.pdf
  • 45. Kriauciuniene_Jurate_CES_2010

    0 1 9 8 0 2 0 0 0 -40 -25 -10 5 20 35 50 1 9 2 0 1 9 4 0 1 9 6 0 1 9 8 0 2 0 0 0 -30 -15 0 15 30 45 60 1 9 2 0 1 9 4 0 1 9 6 0 1 9 8 0 2 0 0 0 -35 -20 -5 10 25 40 55 70 1 9 2 0 1 9 4 0 1 9 6 0 1 9 8 0 2 0 0 0 -40 -25 -10 5 20 35 50 65 80 1 9 2 0 1 9 4 0 1 9 6 0 1 9 8 0 2 0 0 0 -40 -25 -10 5 20 35 50 65 80 1 9 2 0 1 9 4 0 1 9 6 0 1 9 8 0 2 0 0 0 -55 -40 -25 -10 5 20 35 50 1 9 2 0 1 9 4 0 1 9 6 0 1 /media/ces/Kriauciuniene_Jurate_CES_2010.pdf
  • 46. BIGJ_windrose_2005-2014

    Wind rose BIGJ 2005 − 2014 90 80 70 60 50 40 30 2010360350340 330 320 310 300 290 280 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 120 110 100 1 2 3 4 5 6 7 Frequency of wind direction (%) Aerodrome Total observations: 1324 Calm: 2.6% Variable winds: 0.23% Average wind speed for wind direction Wind direction (°) Wind speed (knots ) 0 5 10 15 0 45 90 135 180 225 270 315 360 N E S /media/vedur/BIGJ_windrose_2005-2014.pdf
  • 47. BIIS_windrose_2005-2014

    Wind rose BIIS 2005 − 2014 90 80 70 60 50 40 30 2010360350340 330 320 310 300 290 280 270 260 250 240 230 220 210 200 190 180 170 160 150 140 130 120 110 100 2 4 6 8 10 Frequency of wind direction (%) Aerodrome Total observations: 33412 Calm: 12% Variable winds: 11% Average wind speed for wind direction Wind direction (°) Wind speed (knots ) 0 5 10 15 0 45 90 135 180 225 270 315 360 N E S W N /media/vedur/BIIS_windrose_2005-2014.pdf
  • 48. Web downtime due to maintenance

    downtime due to maintenance 21.9.2015 Due to the renovation of our electricity systems, IMO's web will be inaccessible this afternoon and until evening. Expected downtime is from 3:30 PM to 8:00 PM. We apologize for any inconvenience this may cause. Warning /about-imo/news/nr/3193
  • 49. Publications 2015 (English)

    : Application to partly glacierized and/or groundwater-fed catchments Philippe Crochet 30 1.3 2015-007 Regional Flood Frequency Analysis: A case study in eastern Iceland Philippe Crochet & Tinna Þórarinsdóttir 47 5,7 2015-006 Impact of snow and cloud cover on the surface energy budget over Iceland based on HARMONIE model simulations Nikolai Nawri 42 3,4 2015-005 Cyclones /about-imo/publications/2015/
  • 50. Earthquakes and pre-earthquake processes

    JSR-2009 Earthquakes and pre-earthquake processes Extended abstract submission deadline is 30 October /earthquakes-and-volcanism/conferences/jsr-2009/

Page 5 of 7






Other related web sites


This website is built with Eplica CMS