15
Building a dynamic sea barrier which can quickly be set up by if the sea is rising. The wharf
area should have closed roads and pedestal heights. The areas in between can contain regulated
terrain. All together this would create a barrier against rising sea water
Sewage systems are separated into waste water and rain water
Increased knowledge
There is a need for building up a dynamic
/media/loftslag/CASE_A___Jes_Pedersen_(Region_Midt,_Dk)_Introduction.pdf
a dynamic sea barrier which can quickly be set up by if the sea is rising. The wharf
area should have closed roads and pedestal heights. The areas in between can contain regulated
terrain. All together this would create a barrier against rising sea water
• Sewage systems are separated into waste water and rain water
Increased knowledge
There is a need for building up a dynamic groundwater
/media/loftslag/Case_A___Horsens_Fjord.pdf
should have closed roads and pedestal heights. The areas in between can contain regulated
terrain. All together this would create a barrier against rising sea water
• Sewage systems are separated into waste water and rain water
Increased knowledge
There is a need for building up a dynamic groundwater/surface water model which will inform planners
about the critical levels for sea level rise
/media/loftslag/Horsens_case.pdf