stakeholder involvement as different methods
might appeal to different stakeholders. Secondly, different approaches to the same issue might shed light on different aspects.
Finally, and most importantly, the objective of SCENES to inform water managers and policy makers was thought to be better
served with a set of scenarios that included both long-term explorations and short-term (normative) actions
/media/loftslag/Kok_et_al._TFSC_published_2011.pdf
in other experts outside the Nordic
countries. Although most instructors and participants are from the Nordic countries the
working language on the course is English.
The objective of the course is to develop and deliver a training programme that brings the
new developments in meteorology and in forecasting tools to the forecasters and to
promote networking among forecasters and experts from
/media/vedurstofan/utgafa/skyrslur/2009/NOMEK09_Report.pdf
in north-western Europe “
University of Oslo Droughts WTs SummaryRelationsIntroduction Outlook
OGWL: Objective Grosswetterlagen
• ObjectiveWTC based on Hess-Brezowsky Grosswetterlagen,
- developed for central Europe using expert knowledge,
• input data: MSLP and Z500 (geopotential heights),
• 29 WTs,
• WTs are characterised by flow direction (W, NW, N, NE,...) and
cyclonicity (anticyclonic, cyclonic
/media/ces/AnneFleig_May2010_CES.pdf
the modelling process.
The objective of this paper is to analyse the need and role
for uncertainty analyses at the various stages of the modelling
process and to briefly review methodologies and tools suitable
for these various types of uncertainty assessments. The paper
focuses on uncertainty in the modelling process. As such it
touches upon aspects of uncertainty related to the broader pol-
icy
/media/loftslag/Refsgaard_etal-2007-Uncertainty-EMS.pdf
will be compared.
1The term acceptability refers to degree of positive or negative
will be made.
1.1. Acceptability of TDM measures
The acceptability1 of a TDM measure, is important for
whether or not it will effectively modify travel behavior
(see e.g. Schade, 2003). However, TDM measures are
rarely considered to be both effective in a more objective
sense, and perceived as acceptable by car users
/media/loftslag/Eriksson_Garvill_Nordlund_2006.pdf
group is supposed to choose a different task package.
Case task sets (choose either 1 or 2)
1. Defining and framing the problem, stakeholders involvement, and initial analysis
Involve and clarify at least the following elements:
1.1. objectives
1.2. objective hierarchy
1.3. stakeholder mapping and involvement plan
1.4. process outline
1.5. expected outcome (what kind of answers
/media/loftslag/Outline_for_the_case_Road_maintenance_in_a_changing_climate.pdf
communication in the existing project phase as well as to propose methods and approaches to
increase the stakeholder involvement and relevance in future research programmes on climate
effects on renewable energy. A further objective has been to raise the awareness of the CES
project in general and of its results and energy relevance in particular. The results presented in
this abstract reflect
/media/ces/ces-oslo2010_proceedings.pdf