planning; 2) a state-of-the-art
literature review, examining European and American municipal and regional adaptation strategies, 3)
interviews (20-30) with municipal and regional planners and policy makers in Copenhagen and Portland; 4)
the use of a Multi-Criteria Decision Support (MCDS) software tool to help understand how different groups
rank and value competing planning goals within
/media/loftslag/programme2---PhD-Workshop-preceding-Adaptation-Research-Conference.pdf
development:
Experiences from the SCENES project
Kasper Kok a,, Mathijs van Vliet a, Ilona Bärlund c, Anna Dubel b, Jan Sendzimir b
a Wageningen University, P.O. Box 47, 6700 AA Wageningen, Netherlands
b International Institute for Applied Systems Analysis, Schlossplaz 1, A-2361 Laxenburg, Austria
c Helmholtz Centre for Environmental Research (UFZ), Brückstrasse 3a, 39114 Magdeburg, Germany
a r t i c
/media/loftslag/Kok_et_al._TFSC_published_2011.pdf
extensively used in experimental economics over the
past 20 years. One robust result is that a considerable percentage of individuals voluntar-
ily cooperate, even though the Nash equilibrium is to contribute nothing to the public good
(see Anderson 2001 and Ledyard 1995, for reviews).3 Once we drop the homo-œconomicus
hypothesis, by assuming that either all agents have social preferences or agents
/media/loftslag/Public-Choice-2012---Teyssier---Inequity-and-risk-aversion-in-sequential-public-good-games.pdf
and on the road into the area making observation of the eruption more difficult for
the scientists in the field.
Seismic activity in Bardarbunga continues to be strong. Since Monday, the 3. of November, 200 earthquakes have
been detected in the caldera. The largest measured earthquake was on Tuesday, November 4. at 20:45 of M4,8. A
total of 15 earthquakes were of sizes between M 4 and 5; 15 of sizes
/media/jar/Factsheet_Bardarbunga_20141105.pdf
stage
)Suppor
t
an
d
ski
lls
n
ee
de
d
Har
e
et
a
l.
(2003
)
X
X
An
aly
se
lin
ks
be
tw
ee
n
participator
y
structur
e
an
d
proces
s
implementatio
n
Ba
rr
et
ea
u
et
a
l.
(2010
)
X
X
X
Pr
o
vid
e
cle
ar
de
sc
rip
tio
n
o
fproces
s
(m
an
ag
e
ex
pe
ct
at
io
n
s);
monitorin
g
an
d
evaluatio
n
Bot
s
an
d
va
n
Daale
n
(2008
)
X
X
X
X
X
Su
pp
o
rt
pr
o
ce
ss
de
sig
n
Ad
ap
te
d
fra
m
ew
o
rk
u
se
d
in
th
/media/loftslag/Hare-2011-ParticipatoryModelling.pdf
of authors)
Two commenting reviews for the draft report
Executive summary (of about 20 pages) will discussed and accepted by line by
line procedure by government delegations early in 2011
1203/02/2010
Relative position within innovation chain
1303/02/2010
Book: Energy Vision 2050, VTT 2009
1403/02/2010
1503/02/2010
1603/02/2010
Total investments needed by 2050 are huge
In addition to electricity
/media/ces/Savolainen_Ilkka_CES_2010.pdf
season cannot begin before March prevents untimely detection. Once
the maximum is found, the first 10-day period with accumulated melting exceeding 20 mm
and a median temperature above 0°C is identified and the first day of this period selected as
the onset date. In the case of Búðarháls in Figure 6, the filter picked 06/04 correctly as the
beginning of the melt season.
The third filter
/media/vedurstofan-utgafa-2022/VI_2022_006_extreme.pdf