37 results were found for og���������������������-(������������900bet.net������)-���������������������������-bet36365������������������������-(������������bet91.net������)-og���������������������-og���������������������-���������������������app������������-(������������sogou7.com������).
opportunity evaluation
Case studies
NOE Net
SEAS-NVE
Findings of case studies
• Distribution companies generally well
equipped for climate change
– Cabling of all overhead lines well under way
– Distribution boxes in areas with increased risk of
flooding are elevated already
– Salt spray further inland is becoming an increasing
problem for substations and transformers
Cabling in Denmark
/media/ces/James-Smith_Edward_CES_2010.pdf
/lexuriserv/lexuriserv.do?uri=com:2007:0002:FIN:EN:PDF, 13
April 2009.
[2] WTO, World Tourism Organization (2008): “Climate Change and Tourism -
Responding to Global Challenges”, UNWTO, 9 July 2008, Madrid, Spain.
Available at:
http://www.unwto.org/media/news/en/press_det.php?id=1411&idioma=E, 7
March 2010.
[3] Mooney, J.E. y Miller, M.L. (2009): “Climate change: Creating demand for
sustainable
/media/loftslag/ECONOMIC_EFFECTS_OF_CLIMATE_CHANGE_ON_THE_TOURISM_SECTOR_IN_SPAIN.pdf
operational cost, etc.) and the annual
revenues
• consider an appropriate discount rate and assess NPV (net present
value), IRR (internal rate of return), and net cash flows
• rank alternatives by score level
• SCBA: social CBA – total benefits -/- total costs for society, in this
case benefits and costs often don’t accrue (entirely) to the same
organisation due to the public nature of a project
/media/loftslag/Perrels-CBA.pdf
); new long-term investment strategy prioritizing low- or zero-net carbon forms of
mobility
2040 Modal shift in logistics chains, especially within heavy industry.
3.3 Backcasting scenario narrative
Low-Impact Mobility Project Evaluation (LIMPE)
Climate change is occurring. Is it natural or anthropogenic? It doesn’t matter. Even
though the future is inherently uncertain, one certainty
/media/loftslag/Group4.pdf
of events closely.
Photo: Sigurlaug Gunnlaugsdóttir.
Bárðarbunga
Pálmi Erlendsson, Bergur H. Bergsson and others installing GPS and com-
munication equipment. Photos: Þorgils Ingvarsson and Benedikt G. Ófeigsson.
I C E L A N D I C M E T O F F I C E / A N N U A L R E P O R T 2 0 1 4
5
The magma intrusion from Bárðarbunga
to the eruption site at Holuhraun and
related tremor pulses
/media/vedurstofan/utgafa/skyrslur/2015/IMO_AnnualReport2014.pdf
level in Skeidará waned. The last sign of a
crater explosion was seen at GRF early on 6
November, leaving only a weak tremor signal
from the remnants of the jökulhlaup. The
jökulhlaup fi nally ended in early December,
after ~0.8 km3 of water had drained from the
Grímsvötn lake (J. Hardardóttir, personal com-
munication, 2005).
Location and Volume Constraints
Earthquake locations at Grímsvötn
/media/jar/myndsafn/2005EO260001.pdf
a systematic com-
parison of results to observed precipitation has been carried out. Un-
dercatchment of solid precipitation is dealt with by looking only at
days when precipitation is presumably liquid or by considering the
occurrence and non-occurrence of precipitation. Away from non-
resolved orography, the long term means (months, years) of observed
and simulated precipitation are often
/media/ces/Paper-Olafur-Rognvaldsson_92.pdf
and possibly the stake-
holders at different phases of the modelling project.
Many QA guidelines exist such as Middlemis (2000) and
Van Waveren et al. (1999). The HarmoniQuA project (Schol-
ten et al., 2007; Refsgaard et al., 2005a) has developed a com-
prehensive set of QA guidelines for multiple modelling
domains combined with a supporting software tool, MoST
(downloadable via http
/media/loftslag/Refsgaard_etal-2007-Uncertainty-EMS.pdf