77 results were found for pk108������������-���������������������bet91.net���������-������������������������������������-OG������������������-���������������������bet25.net���������-pk108������������-pk108������������-������������������������������-���������������������700bet.net���������.
in the period 6th to the 22nd, eight from ships and one from land. The icebergs were closest to land at 66°28,81'N og 21°23,86'V and close to Selsker (66°07,5N og 21°31'V).
No seaice was in the Greenland Strait in August and northeasterly winds prevailed in the area
/sea-ice/monthly/2009/nr/2330
Flugskýrsla TF-SIF
14. desember 2010
Flug nr. 17610.025
Í dag var farið í eftirlits- og hafískönnun undan vestfjörðum. Í ljós kom að hafís er mun fjarri
landi en í síðustu könnun á flugvélinni þann 14 des.
Ísrönd sjáanleg á ratsjá liggur um eftirfarandi staði:
1. 6604 – 2740
2. 6616- 2613
3. 6624- 2538
4. 6644-2502
5. 6646- 2522
6. 6654-2521
7. 6709-2420
8. 6729
/media/hafis/skyrslur_lhg/hafisskyrsla_lhg_20101218.pdf
Hafísskýrsla TF-SIF
13. desember 2010
Flug nr. 17510.025
Ískönnunarflug 13 desember 2010
Í dag var farið í hefðbundið eftirlitsflug um austur, norður og vesturmið. Komið var að hafís
norður af vestfjörðum, og meginísinn kortlagður með eftirlitsbúnaði flugvélarinnar. Hér að
neðan má sjá afrakstur eftirlitsins.
Kl 1555 ískönnun hefst.
Kortið hér að neðan sýnir
/media/hafis/skyrslur_lhg/Hafisskyrsla-13-12-2010.pdf
increased net precipitation and increased rainfall intensity put pressure on the sewage
system and the lake dam. Flooding of the town is expected to occur more frequently. Future flooding
storms could be as high as 2,5 meters.
The challenges have been divided into two main themes: sea level change and rainfall.
NONAM Risk Assessment and Stakeholder Investment. Multidisciplinary Workshop
/media/loftslag/CASE_A___Jes_Pedersen_(Region_Midt,_Dk)_Introduction.pdf
increased net precipitation and increased rainfall intensity put pressure on the sewage
system and the lake dam. Flooding of the town is expected to occur more frequently. Future flooding
storms could be as high as 2,5 meters.
The challenges have been divided into two main themes: sea level change and rainfall.
NONAM Risk Assessment and Stakeholder Investment. Multidisciplinary Workshop
/media/loftslag/Case_A___Horsens_Fjord.pdf