a common understanding of the possible
future developments, the risk assessment framework is best
carried out in brainstorming-based sessions
square4 risks/ opportunities are examined mainly from two perspectives:
square4 how risks/ opportunities are connected to the power plants'
functions
square4 how they occur seasonally
702/07/2010
Tools for data collection – Seasonal plan
square4
/media/ces/Keranen_Jaana_CES_2010.pdf
with 20% and 2% for the HIRHAM experiments
using HadAM3H and with 30% and 7% for the ECHAM-
driven experiments for Middle Europe and Scandinavia,
respectively.
[18] RCM output is not available for the entire period
1961–2100 because transient RCM simulations are com-
putationally very demanding. Instead two 30-year time
slices are available; one representative for the climate in
the period 1961–1990
/media/loftslag/vanRoosmalen_etal-2009-WRR_2007WR006760.pdf
in an overall
cold bias, compared with station measurements. To test, whether this is due to the HARMONIE
model core or the external surface scheme, biases of 2-m temperature from SURFEX are com-
pared with biases of temperature projected from the lowest two model levels to 2 mAGL. It is
found that the negative temperature biases are due to shallow inversion layers near the ground,
which are introduced
/media/vedurstofan/utgafa/skyrslur/2014/VI_2014_005.pdf
tg
ui
da
n
ce
fo
rt
ra
ns
bo
un
da
ry
w
at
er
s,
pr
ep
ar
ed
an
d
P. van der Keur et al.
(floo
dmanag
ement
)an
d
wat
er
qualit
y
ag
re
ed
u
po
n
in
co
m
m
o
n
u
n
de
rs
ta
nd
in
g,
creat
ed
th
e
bas
is
fo
rth
e
formul
atio
n
o
f
joi
nt
m
ea
su
re
s
(Fr
ijte
rs
an
d
Le
en
tv
aa
r
200
3)
Mo
del
s
(na
tural
,te
chnica
l
an
d
so
ci
al
sy
ste
m
s):
Uncert
aint
y
ha
s
to
be
incorp
orated
:
1:
Ep
ist
/media/loftslag/VanderKeur_etal-2008-Uncertainty_IWRM-WARM.pdf
; fax: +358 20 490 2590.
E-mail address: Noora.Veijalainen@ymparisto.fi (N. Veijalainen).
Journal of Hydrology 391 (2010) 333–350
Contents lists available at ScienceDirect
Journal of Hydrology
journal homepage: www.elsevier .com/ locate / jhydrol
Author's personal copy
narios from GCMs or RCMs, and with different emission scenarios
(e.g. Menzel et al., 2006; Minville et al., 2008; Prudhomme and Da
/media/ces/Journal_of_Hydrology_Veijalainen_etal.pdf
results: see Blanco et al. (2010) and Dannenberg et al. (2007).
3 Experimental design
The experiments were conducted at the GATE research center, Lyon, France. The ex-
periment was computerized using the Regate software (Zeiliger 2000). We recruited 118
undergraduate students from three Business and Engineering schools using ORSEE soft-
ware (Greiner 2004). Six experimental sessions were run
/media/loftslag/Public-Choice-2012---Teyssier---Inequity-and-risk-aversion-in-sequential-public-good-games.pdf
materials can be done beforehand.
7. SA 7: Remove any obstacles to participation.
This could include participant training
sessions or extra funding if a lack of
knowledge or funding is perceived.
8. SA 8: Assess conflict and trust levels. In water
management, as elsewhere, conflict and lack
of trust between stakeholders at different
levels may already exist before the process
starts. This can have
/media/loftslag/vonKorff_etal-2010.pdf
were carried out to obtain the flow and
sliding parameters for Hoffellsjökull that resulted in a good
simulation of the observed 20th century evolution of the
glacier geometry. The obtained values for the rate factor
and the sliding parameter are A= 4.6× 10−15 s−1 kPa−3 and
C = 10× 10−15 m a−1 Pa−3, respectively.
The ice divide is kept at a fixed location in the model com-
putations presented here
/media/ces/Adalgeirsdottir-etal-tc-5-961-2011.pdf