Search

67 results were found for WA 0821 1305 0400 Order Pembuatan Plafon Gypsum Indoboard Makasar Jakarta Timur.


Results:

  • 51. Protective measures

    resolution pdf for printing, 28 Mb; order free paper copies) Background for the determination of dam height in the SATSIE dam design guidelines (IMO Int. Rep. 08003, 2008, authors T. Jóhannesson, Kristín M. Hákonardóttir, C. B. Harbitz and U. Domaas) (pdf 1.0 Mb) Software for the computation of run-up of snow avalanches on catching and deflecting dams as well as on natural terrain /avalanches/imo/protective/
  • 52. Web-pages on the Eyjafjallajökull eruption 2010

    This is an overview of web-sites related to the Eyjafjallajökull eruption in 2010 and it's precursor, the eruption in Fimmvörðuháls. The articles and news are in reversed time order. Short articles Increased glacial melt due to volcanic ash - 19 January 2011 Flood warning system and jökulhlaups - Eyjafjallajökull - 7 /earthquakes-and-volcanism/articles/nr/2221
  • 53. NONAM

    and useful standardization of methods with the aim to speed up uptake of these applications and learning from these applications across the Nordic countries and in order to develop a Nordic framework for adaptive management the development of academic and professional education in Nordic countries needed to support the development and use of these methodologies Duration of the project April /nonam
  • 54. The design of avalanche protection dams

    needs to be based on an understanding of the dynamics of granular flows against obstructions that lead to a change in the flow direction, slow the flow down or cause it to stop. Laboratory experiments have been performed in recent years with granular material in order to shed light on the dynamics of avalanche flow over and around braking mounds and catching dams and to estimate the retarding effect /about-imo/news/nr/1631
  • 55. Risk assessment of volcanic eruptions

    to volcanic eruptions must be made. An integrated risk assessment consists of an evaluation of potential hazard and the vulnerability of society, followed by an estimate of the corresponding risk and of feasible counter-measures in order to prevent accidents and minimise economic damage. The work on a general risk assessment will be organized in accordance with the risk assessment framework /about-imo/news/nr/2280
  • 56. Supporting structures stopped most of an avalanche

    that the avalanche would have been many times larger, and that it might have reached the health care centre, if the supporting structures had not reduced the released snow volume by an order of magnitude. This is the first example of supporting structures preventing or reducing the size of a snow avalanche in Iceland. Supporting structures for preventing snow avalanches have been installed /about-imo/news/nr/2476
  • 57. Supporting structures stopped most of an avalanche

    be assumed that the avalanche would have been many times larger, and that it might have reached the health care centre, if the supporting structures had not reduced the released snow volume by an order of magnitude. This is the first example of supporting structures preventing or reducing the size of a snow avalanche in Iceland. Supporting structures for preventing snow avalanches have been /avalanches/articles/nr/2475
  • 58. The final CES conference, 31 May-2 June 2010

    Substantial changes have taken place in the climate of the Nordic countries in the last 20-30 years and changes on the same order of magnitude are expected until the middle of the 21st century. It was clear from many presentations at the conference that energy companies have already taken recent changes in climate and the consequent changes in hydrology into account in their operations. The companies /ces/nr/1979
  • 59. NONAM

    and useful standardization of methods with the aim to speed up uptake of these applications and learning from these applications across the Nordic countries and in order to develop a Nordic framework for adaptive management the development of academic and professional education in Nordic countries needed to support the development and use of these methodologies Duration of the project April /nonam/
  • 60. Ash measurements

    Eyjafjallajökull which erupted last year. The aim was to measure windblown resuspended ash from last year's eruption. Following the eruption at Grimsvotn it was on May 22nd moved to the Keflavik International Airport in Keflavík in order to detect ash if as was present in the atmosphere above the airport. The IMO owns a weather radar which is situated on Miðnesheiði, close to the Keflavík /about-imo/news/nr/2183/

Page 6 of 7






Other related web sites


This website is built with Eplica CMS