increased net precipitation and increased rainfall intensity put pressure on the sewage
system and the lake dam. Flooding of the town is expected to occur more frequently. Future flooding
storms could be as high as 2,5 meters.
The challenges have been divided into two main themes: sea level change and rainfall.
NONAM Risk Assessment and Stakeholder Investment. Multidisciplinary Workshop
/media/loftslag/CASE_A___Jes_Pedersen_(Region_Midt,_Dk)_Introduction.pdf
increased net precipitation and increased rainfall intensity put pressure on the sewage
system and the lake dam. Flooding of the town is expected to occur more frequently. Future flooding
storms could be as high as 2,5 meters.
The challenges have been divided into two main themes: sea level change and rainfall.
NONAM Risk Assessment and Stakeholder Investment. Multidisciplinary Workshop
/media/loftslag/Case_A___Horsens_Fjord.pdf
fiord area. Adaptive challenges due to changes in regional groundwater level
An increase in sea level will cause more frequent flooding in the town due to its low lying position by
the fjord. In 2006, the local town hall was flooded when sea level rose to 1.76 m above normal.
Simultaneously, increased net precipitation and increased rainfall intensity put pressure on the sewage
system
/media/loftslag/Horsens_case.pdf
NONAM PhD course – Adaptive management in relation to climate change – Copenhagen 21-26/8/2011
……………………………………………………………………………………………………………………………………………………………………
1
Outline for the case Road maintenance in a changing climate
Introduction
Roads and transport systems are vulnerable to climate change impacts (VTT 2011; Koetse and
Rietveld, 2009; Regmi & Hanaoka, 2011; Road ERA-net 2009 & 2010
/media/loftslag/Outline_for_the_case_Road_maintenance_in_a_changing_climate.pdf
line shows the number of all measured earthquakes but the red line shows the number of earthquakes above 1.5 in magnitude.
During these years, the measuring net has improved and become more sensitive. That is the reason for showing the larger earthquakes separately.
18 August 2014 20:45 - An overview of the first three days
Since the onset of the earthquake swarm at Bárðarbunga on Saturday
/earthquakes-and-volcanism/articles/nr/3000
–5
months per year depending on watershed. Mean yearly maximum snow thickness
decreases by 0–80%.
Winter flow is predicted to increase on average due to a higher number of melt events at
relatively high and flat heath areas of the watersheds. For Sandá í Þistilfirði, vhm 26, the
snowmelt generated spring/summer discharge peak largely disappears and the seasonal
discharge becomes more evenly
/media/ces/2010_016.pdf
of radiation are
added to a classic degree-day model. For infiltration, a methodology of Peschke, based on
the approach of Green and Ampt, was used. To calculate the fluxes within the unsaturated
soil zone, the Richards equation was used. The groundwater table was modelled in both the
unsaturated zone module and the groundwater module. The coupling between both modules
was done by a net/media/ces/2010_017.pdf
in 1991. The blue dashed line shows the number of all measured earthquakes
but the red line shows the number of earthquakes above 1.5 in magnitude.
During these years, the measuring net has improved and become more sensitive. That is the
reason for showing the larger earthquakes separately.
18 August 2014 20:45 - An overview of the first three days
Since the onset of the earthquake swarm
/media/jar/Bardarbunga-2014_August-events.pdf
line shows the number of all measured earthquakes but the red line shows the number of earthquakes above 1.5 in magnitude.
During these years, the measuring net has improved and become more sensitive. That is the reason for showing the larger earthquakes separately.
18 August 2014 20:45 - An overview of the first three days
Since the onset of the earthquake swarm at Bárðarbunga on Saturday
/earthquakes-and-volcanism/articles/nr/3000/
Summary of the break-out sessions on road infrastructure
By Adriaan Perrels (FMI)
1. Introduction
The break-out sessions, three in total, were interspersed between the various oral presentations
on Thursday afternoon, Friday morning and Friday afternoon. Each session was 60 to 80
minutes. The participants had two assignments:
1. deliberate 7 questions on issues pertaining subsequent
/media/vedurstofan/NONAM_1st_workshop_summary_v3.pdf