-13
FL180: 270/25-45KT, but 26015KT by the NE-coast, -29
Overview of weather systems:
1000 km S of Cape Farewell is an extensive 980 mb low. Over Greenland is a 1038 mb high.
Near surface winds:
N-ly or variable wind, 05-25 KT.
Cloud heights/visibility/weather:
BKN/OVC at 1000-2500 FT in the N-part and occasional snowshowers with poor visibility. Widely FEW/SCT and good
/weather/aviation/llf-iceland/
period, as well as changes from the control to the 2070–99 reference period,
for the reduced IPCC ensemble mean, the SMHI-RCAO, the MetNo-HIRHAM,
and the DMI-HIRHAM5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
18 Warming by month from the 1991–2000 to the 2091–2100 period in ENSEMBLES
RCMs using either the HadCM3 or the ECHAM5 as driving GCM. . . . . . . . . . 40
7
1
/media/ces/2010_005_.pdf
at the beginning of the 2000 – 01
winter months, and at the beginning of the 2001 summer months, are shown in Figure 6. In all
these examples, there is at least one well-developed low-pressure centre present within the study
domain. These weather systems have a recognisable cyclonic circulation, with closed isobars
within up to about 1000 km from the pressure minimum.
These findings are compatible with more
/media/vedurstofan/utgafa/skyrslur/2015/VI_2015_005.pdf
of the model with
past observations, it is used to simulate the future response of
the glacier during the 21st century. The mass balance model
was forced with an ensemble of temperature and precipita-
tion scenarios derived from 10 global and 3 regional climate
model simulations using the A1B emission scenario. If the
average climate of 2000–2009 is maintained into the future,
the volume
/media/ces/Adalgeirsdottir-etal-tc-5-961-2011.pdf
• Analyse future snow scenarios
Introduction Data & Methods Results
0
50
100
150
200
250
300
350
400
450
0-100 100-
200
200-
300
300-
400
400-
500
500-
600
600-
700
700-
800
800-
900
900-
10001000-
1100
1100-
1200
1200-
1300
1300-
1400
1400-
1500
1500-
1600
1600-
1700
1700-
1800
1800-
1900
1900-
20002000-
2100
2100-
2200
Høyde (m o.h.)
A
n
t
a
l
l
v
æ
r
s
t
a
s
j
o
n
e
r
Elevation of met.no
/media/ces/Dyrrdal_Anita_CES_2010.pdf
in autumn and winter in the
100a flood from observations (m3 s)
100a flood from simulation
s
(m
3
s)
a
1
10
10
0
100
0
1000
0
1 10 100 1000 10000
0.
1
1
10
10
0
100
0
0.1 1 10 100 1000
Average discharge from
observations (m3 s)
Average discharge from
simulation
s
(m
3
s)
b
Fig. 4. Comparison of simulated (with observed temperatures and precipitations) and observed values in 1971–2000/media/ces/Journal_of_Hydrology_Veijalainen_etal.pdf
Manage- Basic Purchase Road Road net- Const- Acquisi- Govern- Com- Participati- Value Miscel- Total 2009
ment and road of equip- system work post- ruction tion of ment missi- on of the added laneous cost
operating manage- ment develop- poned-, of land grants ons European tax over- level
costs ment ment comprehen- build- and com- Regional De- heads
1991- 1991- sive- and ings pensation
/media/loftslag/Traffc-maintenance_expenditures.pdf
and Lambert, 2000). For
wind energy assessments, the interest is primarily on high wind speeds. Therefore, following the
method employed by Troen and Petersen (1989), the two Weibull parameters are calculated here
by: 1) matching the average wind power density in the Weibull distribution to that of the measured
or modelled distribution of wind speeds; and 2) requiring the occurrence of above average wind
/media/vedurstofan/utgafa/skyrslur/2013/2013_001_Nawri_et_al.pdf
improving
management policies and practices by learning from the
outcomes of implemented management strategies. Partici-
patory integrated assessment is here a form of problem
structuring for identification of gaps, ambiguity and
multiple frames, confrontation, and integration of the
most divergent views with respect to a given problem
situation.
Additional methods and tools that AM require com/media/loftslag/Henriksen_Barlebo-2008-AWM_BBN-Journ_Env_Management.pdf