Registration
Registration
Lidar 2013
To register, please send an e-mail to lidar2013@vedur.is indicating whether you plan
/lidar/lidar-2013/registration/
to influence freedom to choose travel mode, own
ways. Air pollution through emissions, the use of
household traveling, policy measures such as laws and
regulations, economic incentives and disincentives, as well
soft strategies, such as information and education, aim to
(Loukopoulos, 2005). Collectively, strategies aiming to
change travel behavior are often referred to as travel
demand management (TDM
/media/loftslag/Eriksson_Garvill_Nordlund_2006.pdf
telecommunication
Accommodation (GPS coordinates) and other places you plan to visit/stop at
Few words about the equipment
Plan B
Travellers can leave their travel plan with ICE-SAR, provided it includes a contact or relative whose responsibility is to alert ICE-SAR if the travellers do not arrive at the right time. ICE-SAR also provides a more extensive service with shared responsibility
/about-imo/news/nr/2497
coordinates) and other places you plan to visit/stop at
Few words about the equipment
Plan B
Travellers can leave their travel plan with ICE-SAR, provided it includes a contact or relative whose responsibility is to alert ICE-SAR if the travellers do not arrive at the right time. ICE-SAR also provides a more extensive service with trip monitoring as an option within the travel plan
/about-imo/news/nr/2707
it be mitigated?
June 2010 3
UK electricity system
Conventional
thermal
42%
CCGT
34%
Nuclear
13%
Wind
2%Hydro
5%GT/Oil
2%
Other renewables
2%Generation capacity mix
at December 2008
(total capacity is 83.5 GW)
Research on future
networks including using
climate scenarios
June 2010 4
Network capacity (ampacity)
• Electric current running through a wire
generates heat
• Ambient conditions
/media/ces/Cradden_Lucy_CES_2010.pdf
climate
Regulatory
conditions
Framing Multiple
knowledge
frames
What is risk?
- alternative definitions
• Risk is something you can compute (= statistical
uncertainty) while uncertainty is something you cannot
compute (= the other types of uncertainty)
• Risk = probability
• Risk = probability of exceedance of a critical threshold
• A risk is characterised through/media/loftslag/Refsgaard_2-uncertainty.pdf
of Eyjafjallajökull and Mýrdalsjökull
was held. All institutes that are
involved during real events
participated and inhabitants were
evacuated
Information from CPD
IMO – CPD collaboration
IMO issues warnings and information on natural hazards to CPD
CPD activates their contingency plan accordingly
Information to public issued through
public radio and television
web
mobil web
text TV
/media/loftslag/Karlsdottir-Risk_analysis_IMO_SK.pdf
balance scenarios:
• correct several parameters in several dimensions
• large amount of data needed
• more simple methods?
• e.g. general trends from climate-model ensembles
superimposed to measurements
Thank You
We greatly acknowledge the Rossby Center
and Ralf Döscher for providing us with the
RCAO output and DMI for the HIRHAM4 data
Thomsen and Reeh (1986)
/media/ces/Machguth_Horst_CES_2010.pdf
on the respective day. Poster presentations (during all three coffee breaks) Tuesday 11 October Arrival and
check-in. Most flights will arrive in the afternoon, so you should be
at your hotel around 17:00/18:00.19:00 Kickoff
party at IMO (Bústaðavegur 7, 108 Reykjavík). We will meet you at 18:30 outside Grand Hotel and walk together to IMO. Should anybody prefer to get a lift by car, please
/norsem/norsem2016/program/